Wednesday, November 9, 2011

Technology and pilot plant results of the advanced amine process

Energy Procedia, Volume 4, 2011, Pages 5527-5533
10th International Conference on Greenhouse Gas Control Technologies
GHGT-10
Frederic Vitse (a), Barath Baburao (a), Ross Dugas (b), Larry Czarnecki (a), Craig Schubert (b)
a Alstom Power, 1409 Centerpoint Boulevard, Knoxville, TN 37932
b The Dow Chemical Company, 23 01 N. Brazosport Blvd., Freeport, TX 77541
Abstract
Development of CO2 capture technologies is being pursued by US, European, Japanese and other suppliers in collaboration with utility companies, universities and Governments in the USA, Europe, Canada and Australia. The Advanced Amine Process (AAP), jointly developed by Alstom and The Dow Chemical Company (Dow) is among the more promising post-combustion solutions.
It will summarize pilot plant results and show the progress of the technology development.
The pilot plant is processing flue gas from a bituminous coal-fired boiler with UCARSOLTM FGC 3000 series of solvents, advanced amine solvents specifically developed by Dow for flue gas applications. The pilot plant has a CO2 removal capacity of ~5 tonne CO2/day and can capture in excess of 90% of inlet CO2.
A test program with a wide range of operating conditions provides information on capture performance, including solvent and operational stability. A state-of-the-art laboratory measures solvent composition, CO2 loading, solvent contamination and degradation species. Long term solvent composition is controlled by a combination of flue gas pre-treatment and solvent reclamation.
Results are being used to develop a large-scale demonstration plant (above 250 MWe) under the EU Flagship program in Europe.

No comments:

Post a Comment