Available power generation cycles to be coupled with the liquid natural gas (LNG) vaporization process in a Spanish LNG terminal

Applied Energy, Volume 88, Issue 7, July 2011, Pages 2382-2390
E. Querol, B. Gonzalez-Regueral, J. García-Torrent, Alberto Ramos
Departamento de Ingeniería Química y Combustibles, Escuela Técnica Superior de Ingenieros de Minas, Universidad Politécnica de Madrid, c Alenza 4 (dpcho417), 28003 Madrid, Spain
Abstract
The boil off gas in Spanish LNG terminals is managed using recondensers. The electricity is bought in the Spanish wholesale market.
A new combined cycle using a gas turbine and a pure NH3 Rankine cycle coupled with the natural gas vaporization process has been chosen as the most advisable one to be installed, due to the lower thermoeconomic cost obtained as shown in a new graphical representation similar to the existing exergetic cost diagrams.