Heat
Transfer Engineering, Volume 35, Issue
3, 2014
Special Issue: In Celebration of
Professor Hans Müller-Steinhagen on his 60th Birthday
Aging
is Important: Closing the Fouling–Cleaning Loop
Edward M. Ishiyama (a), William R. Paterson (b) & D. Ian Wilson
(b)
a IHS Downstream Research , London , United Kingdom
b Department of Chemical Engineering and Biotechnology , University of
Cambridge , Cambridge , United Kingdom
Abstract
Process
units subject to fouling often require regular cleaning, resulting in repeated
cycles of fouling and cleaning. The initial stages of fouling are strongly
influenced by the effectiveness of the most recent cleaning step. Similarly,
the effectiveness and rate of cleaning are determined by the extent and nature
of the deposit layer present on the surface. Consequently, the optimal
operating cycle will be determined by fouling–cleaning interactions.
Because an aged deposit is more difficult to clean, deposit aging is
an important factor in this. Aging provides an element of choice into
fouling–cleaning operating cycles, between in situ “chemical” methods and ex
situ “mechanical” methods, with associated differences in effectiveness, time,
and cost. Authors report a reformulation of the cleaning scheduling problem to
consider the choice of cleaning method, as well as the timing of cleaning. They
present a case study based on a shell-and-tube heat exchanger processing crude
oil to illustrate the concepts and scope of application of this approach.
Full Text Source (Subscription or Fee): http://www.tandfonline.com/doi/abs/10.1080/01457632.2013.825192#.U5cxSnAo5Ms
No comments:
Post a Comment