Monday, January 27, 2014

A Risk Based Approach For Prioritizing Electrical Equipment Replacement And Repair

CATEGORY: RISK MATRIX
Petroleum and Chemical Industry Technical Conference (PCIC), 2013
A Risk Based Approach For Prioritizing Electrical Equipment Replacement And Repair
Christopher Cayanan (1), P.E. Rey Navarro (1), Ernie Wagner (2)
1 Oxy Long Beach, Inc, Long Beach, CA
2 Occidental Oil and Gas Corporation, Houston, TX
Abstract
Electrical infrastructure equipment in the petrochemical and/or oil and gas industry in North America is four decades old or more. The life and reliability of such electrical equipment can be compromised due to operating conditions such as exposure to moisture and chemicals, loading, temperature, vibration, and mechanical stress over the life of the equipment.
Electrical equipment operating and life cycle philosophies tend to vary from age based replacement to run-to-failure. The result is an ad-hoc approach for determining the appropriate time for equipment replacement or major repairs. Limited resources, funding, and other competing projects exacerbate the issue. Authors present a systematic risk based approach of prioritizing electrical equipment replacement and repair projects to improve electrical reliability and safety. The approach uses probability and consequence techniques for equipment repair or replacement. 
An operating and life cycle management philosophy using preventive and predictive maintenance results to prioritize equipment replacements and/or improvement will help optimize how to determine when equipment repair or replacement is justified.
Full Text Source (Subscription or Fee): http://ieeexplore.ieee.org/xpl/login.jsp?tp=&arnumber=6666026&url=http%3A%2F%2Fieeexplore.ieee.org%2Fxpls%2Fabs_all.jsp%3Farnumber%3D6666026

No comments:

Post a Comment